Our Projects
Rumah Makmur Kg. Tiram
Rumah Makmur Kg. Tiram is a 100 acres housing project developed by local developer Nilaitek (M) Sdn. Bhd. Built in phases, it is located in Kg. Tiram, Kuantan. This project
is currently ongoing and SZY is the main C&S and M&E Consultant.
BUKIT MENTOK
This project under ASM Development consists of developing 2184 units of houses and commercial area in Kemaman, Terengganu. SZY is the main Consultant for both C&S and M&E for this project as well. This project is built in phases and is still ongoing since 2011.
PRIMA GAMBANG
We are the main Consultant for both C&S and M&E in developing approvimately 1012 units of Semi-D houses in Gambang. The project is currently ongoing in Phase 3, the last phase.
DEWAN PAYA BESAR
Dewan Paya Besar is a project under Majlis Bandaraya Kuantan (MBK). This development is mainly to cater the needs of lacking of multi- purpose hall in Paya Besar area. The size of the
hall is 1000m2 or 10 badminton courts. We provide comprehensive C&S and M&E services for this project. It has been completed in 2022.
Maahad Tahfiz Edu Resort
Maahad Tahfiz Complex is an Islamic educational school initiated by our Menteri Besar Pahang, Dato’ Seri Wan Rosdy. It is currently ongoing development and shall be completed by 2023.
ANCASA ROYALE HOTEL
We are the main C&S consultant in designing a 4-star hotel in Pekan, Pahang. The seven-storey hotel with 133 rooms, has all the latest facilities including the main ballroom and several function rooms, swimming pool, gymnasium and spa. This project was completed in 2014.
Solar Photovoltaic Farm
SZY is the main C&S Consultant in developing 50MW AC Solar Photovoltaic Farm in Gambang, Kuantan, Pahang under UiTM Holdings Sdn Bhd. The total area is about 200 acres and consists of the Solar Farm itself, UiTM research building etc. This project had been successfully completed in 2020.
Flood Mitigation at Kuantan Main Town
Completed in 2016, this is one of Flood mitigation project under JPS in Kuantan, Pahang. SZY is the lead consultant in designing flood mitigation system at bandar Kuantan.
Water Treatment Plant Langat 2
SZY Consultants has been appointed as one of the consultants for water treatment plant project in Kuala Langat, Selangor. Our scope includes building sludge piping system in the plant using
turbular conveyor belt. The project has just kicked
-off in 2022.
Turbular Conveyor Belt
SZY has been entrusted by Alliance Stell (M) Sdn Bhd to be their lead local consultant in designing the allignment for Tubular Conveyor Belt System in Gebeng Industry Park. The TCB system connects Kuantan Port and MCKIP is approximately 12km in length.
BOARDWALK TIOMAN
Completed in 2017, this project is to build as an improvement for the mobility of local people in Kg Tekek, Tioman. This Boardwalk acts as an attraction for tourist that comes to the island. SZY was assigned by Tioman Development Authority (TDA) as the main C&S consultant.
BALB PAHANG ZON 1 A&B WATER SUPPLY
SZY has been assigned by Pengurusan Air Pahang (PAIP) in designing water supply system for five districts in (Kuala Lipis, Jerantut, Temerloh, Raub & Cameron Highlands) in Negeri Pahang. This project had been completed in 2012.
FEASIBILITY STUDY
-Piperack Facilities
This fast-track project is a feasibility study to determine the necessity of piperack facilities for about 30 industrial users at Gebeng, Kuantan Pahang. SZY had ventured with a team from University of Malaysia Pahang in studying the requirement and developing the alignment options which involved a number of Authorities and land acquisition. SZY had also developed detailed design for the 12km long piperack across Gebeng. The study and detailed design completed in 2016.
INSTITUTIONAL
-KUIPSAS AUDITORIUM
This project from Jabatan Kerja Jaya (JKR) is to build a 500-seater auditorium for Kolej Universiti Islam Sultan Ahmad Shah (KUIPSAS) located in Kuantan, Pahang. SZY provided a comprehensive mechanical and electrical services until the project completed in 2018.
LEGALIZATION
-BREDERO SHAW
SZY has been appointed by Bredero Shaw (M) Sdn Bhd to obtain legalization from the local Authority for its 120 numbers of existing building in the plant located in Gebeng, Pahang. SZY scope of works consists of redrawing the buildings, preparing for submissions and fulfilling the (CCC) from Majlis Perbandaran Kuantan (MPK). This involves both passive and active systems the buildings. The project is currently ongoing and has completed up to 80%.
gis
–ROAD ASSET MANAGEMENT SERVICES
SZY GIS team has been appointed by Yayasan Pahang Maintenance (YPM) to provide road asset management services. SZY scope of services include collecting data for inventory of the length and width of the state, village and agriculture roads in overall Pahang, as well as inventory fo road assets. SZY has done the work since 2013 until current date
-MARRIS Online System
SZY has been appointed to provide GIS services for the State Government from 2019 until 2022. The service includes collecting road data on site using GIS system until finally registering the road data into MARRIS Online System.